Welding of 24mm Thick Oxygen Free Copper Plates for Large Size Turbo-Generator

Jump To References Section

Authors

  • Precision Gasification Services Pvt. Ltd. ,IN
  • Precision Gasification Services Pvt. Ltd. ,IN

DOI:

https://doi.org/10.22486/iwj.v57i2.43852

Keywords:

Welding; fabrication; oxygen free copper; turbo-generator

Abstract

In this article, the process of fabrication of 24mm thick Copper welded and fully machined part of 2500 MW Turbo-generator is discussed. The challenge faced to make Copper Parts for turbo-generator through welding and the ways to overcome them are briefed, discussed. The challenge faced to make this large size turbo-generator through welding and the ways to overcome them are briefed.

Downloads

Published

2024-06-21

Issue

Section

Case Study