Research and Practice of Rapid Excavation Technology for the Large Section and Compound Roof Coal Roadway
Keywords:
Large Section, Compound Roof, Cycle Step, Bolting Machine, Rapid Excavation.Abstract
Targeting at slow tunnelling advance rate problem of the coal roadway with large section and compound roof in Zhaozhuang mine, on the basis of site investigation and statistical analysis, revealed that the engineering geological conditions, support parameters and construction technology are the main factors affecting tunnelling efficiency, and then through the numerical simulation to optimize the roadway support parameters, the theoretical calculation of a reasonable cycle step, the EJM270/4-2 header with bolting machine with higher tunnelling efficiency and tunnelling and bolt integration was selected, the improved excavation construction programme compared to the original construction programme, increased the cycle pace, shortening the cutting of coal, support and other major processes of working time. Field practice results show: not only ensured the safety of tunnelling construction and the stability of surrounding rock, but also increased the monthly footage from 210 m/month to 262 m/month, tunnelling speed increased by 24.7%, at the same time, the roadway molding was better, the labour intensity of workers was reduced, and good benefits have been achieved.
Downloads
Metrics
Downloads
Published
How to Cite
Issue
Section
License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
References
Li, Y. H. (2015): "Support and rapid excavation technology research on soft and mudding roadway in Huale coal mine," Ph.D. dissertation, School of Mines, China University of Mining and Technology, Xuzhou, China, 2015.
Zhang, Z.G. (2016): "Development tendency and key technology of mine seam gateway rapid driving system", Coal Science and Technology, vol. 44, no. 01, pp. 55-60.
Wang, H. (2010): "The 40 years developmental review of the fully mechanized mine roadway heading technology in China", Journal of China Coal Society, vol. 33, no. 11, pp. 1815-1820.
Wang, T.J. (2014): "Application and improvement technology of new high efficient single mine roadway heading system", Coal Science and Technology, vol. 42, no. 05, pp. 121-124.
Zhang, D.S. (2015): "Development and application on rapid driving system", Coal Science and Technology, vol. 43, no. S2, pp. 96-99.
Wang, X.J. (2008): "Heading technology of mining gateway with complex roof under special conditions in Sitai Mine", Coal Science and Technology, vol. 36, no. 12, pp. 22-24.
Fei, X.M. (2008): "A study on fast heading in large-cross-section coal drifts under composite roof conditions in deep mines", China Coal, vol. 34, no. 09, pp. 59-60, 2008.
Nie, X.F., Yan, G.F., Song, Y.G., Zhang, L., Liu, H. (2013): "Technology of large section roadway rapid excavation", Coal Science and Technology, vol. 41, no. S2, pp. 141-142, 2013.
Du, Q.J., Zhao, Q.F., Yang, Z., Guo, J.Z. (2013): "Research and practices on rapid driving technology of mine large cross section seam gateway under complicated geological conditions", Coal Engineering, vol. 45, no. 6, pp. 76-79.